•The need to detect voltage problems during the transient swings was also deemed important.
•The system size required by the member companies ranged from 500 buses to 50,000 buses, 200 generators to 10,000 generators, and a single run computation time of less than a minute.
•Two companies currently have tools which they are testing.
•Several companies identified desirable features in tools they would consider.
•