1.Which Market Structure is Most Efficient
(As % of Theoretical Maximum)?
Active Demand/Preset
Cost-Based Full Two-Sided
Supply with Random Shift Market
RTP 99.6%
99.4%
DRP 96.9%
98.7%
FP 98.7%
99.1%
2. What Rate Change is Required After Runs to Balance the Budget?
Active
Demand/Preset Cost-Based Full Two-Sided Supply with Random Shift
Market
First Group Second Group First Group Second Group
RTP -- -- -- --
DRP - 2.42 ¢/kWh - 3.27 ¢/kWh +
2.1 ¢/kWh + 0.8 ¢/kWh