Basic Microgrid Issues
*Northern and NextEnergy approaches heavily rely on communication system for providing a real-time picture of the loading condition in the microgrid
*Approach requirements:
*Extensive site analysis
*Metering and data collection
*Custom-based design of the system
*Installation of additional unit after design is   difficult