23
Increase Generation Capacity
•Building generation not needed for reserve is expensive
•Building gas turbines ($600/KW) to curtail duopoly pivotal power costs:
•CA: Need 8.4 GW (16% of hours): $5 billion, 10.7¢/KWh for 1400 hours in 2000
•Offset some of the costs with reserve benefit?
•Replace 12,000 Btu/KWh plant with 8,000 Btu plant – For $5/MCF gas, saves $26/1400 hours but costs $60 : offsets 1/3 of costs 
•
•