14
PSERC
Information Different Required by Utility Groups
Asset Managers
Availability of CB
Cost of CB repair
Risk of using CB
Future purchases
Impact on system reliability
 
Maintenance
Repair scheduling
Diagnostic tools
Failure rate
Required parts
Maint. strategy
 
Dispatchers
Real-time status
Breaker failure
Switch.  sequence
Autoreclosure
Fault clearing
 
Protection
Operation timing
Fault clearing
Switch. Sequence
Autoreclosure
Restrikes