•Strategic (#5): Need to improve
relay protection schemes and coordination
•Technical
(#8): Improve system protection to slow or limit the spread of future cascading outages:
• a.) better
application of Zone III
relays
• b.) selective
use of under-voltage load
shedding
• c.) revision to
the criteria for slowing/limiting propagation of cascading failures