PS
ERC
04/06/04
42
Example: Application Tests
•
Sequence of events:
•
fault on the STP-SKY
line
•
Relay #2 trips first and
sends the carrier signal
•
Relay #1 trips after
receiving the carrier
signal
•
the auto-reclosure is
not successful and both
relays trip