PSERC
04/06/04
9
Recommendation #8
•#8a.: Zone III relays
•   - Zone III relay should not operate at or below 150% of the emergency power rating of a line assuming .85% p.u. voltage and line phase angle of 30 degrees
•   - Out of step conditions should not “confuse” the relay
•#8b.: Under-voltage load shedding
•   -low voltage with both high and low frequencies should be considered
•   - coordination with generator under- and over-frequency protection and controls
•#8c.: propose revisions to the planning criteria