•Base case for the given NPCC system in 2002 and the 2007 projected load [3]
•Case #1-the same, except the entire real power generation was re-scheduled in order to support an increased wheel from PJM (Alburtis) through NYISO to IESO
(Milton) –the maximum feasible wheel
1,200MW
•Case #2-the wheel from PJM (Waldwick) through NYISO to IESO (Milton) –the maximum wheel feasible 100MW
•NOT SUFFICIENT TO ONLY SPECIFY NET TIE LINE FLOWS