

lNeed
for reexamination of the indicators that
measure the quality of supplied energy
lUse
of power acceptability curves as a way
of quantifying power quality issues. CBEMA
and ITIC being singled out.
lA design goal for
manufacturers -- to manufacture equipment
that can function in the ‘acceptable power’
region
l
l
l
Background