Proposed Methodology
•The project will initially deal with porcelain insulators.
•Dummy insulators” will be installed at various locations on the distribution system along with simple shape devices such as porcelain tiles or discs so that contamination build up can be acquired. 
•ASU will use the contaminated samples from the field to develop a diagnostic tool that can easily measure surface resistance. 
•The diagnostic tool will allow a field crew to quickly and easily assess the level of insulator contamination in the field.